At first, the Jai Hind metro station was prepared to be elevated. Having said that, the AAI objected which the elevated stretch up into the airport might pose a menace to aircraft, Hence the route was further reworked and also the station was shifted underground, 150 m from the Airport https://railwaygroupdjobs90000.vidublog.com/31309279/railway-recruitment-kolkata-rrb-group-d-32000-vacancy-pdf