The FPS operates a certification procedure for Performing platforms and the Principal Contractor is needed to sign the certification confirming the platform has been adequately designed and correctly made in accordance with the design, and that it'll be consistently inspected and managed. Roof truss installation is challenging and needs specialised https://stevey457sss9.targetblogs.com/profile